South Africa's load shedding crisis has created the world's fastest-growing home battery storage market. With Stage 6 meaning up to 12 hours of daily outages, the right battery backup system is no longer a luxury — it's essential.
Eskom's load shedding stages determine how many hours per day your power will be cut. Stage 2 means approximately 4 hours of daily outages; Stage 6 means up to 12 hours. Your battery backup system must be sized for the worst-case scenario you're willing to protect against.
| Stage | Daily Outage Hours | Min. Battery (Essential Load) | Recommended System |
|---|---|---|---|
| Stage 2 | 4 hours | 2 kWh usable | SI3KS + M16S 5kWh |
| Stage 4 | 8 hours | 4 kWh usable | SI5KS + M16S 5kWh × 1 |
| Stage 6 | 12 hours | 6 kWh usable | SI5KS + M16S 5kWh × 2 |
| Full Off-Grid | 24 hours | 12+ kWh usable | SI6KS + M16S 5kWh × 3+ |
For most South African homes connected to the Eskom grid, a hybrid inverter (like the Solarens SI Series) is the optimal choice. It seamlessly switches between grid power, solar power, and battery backup — typically within 20 milliseconds, fast enough that computers and sensitive electronics don't notice the transition.
An off-grid inverter is only appropriate for homes with no grid connection, or for those who want to completely disconnect from Eskom. The Solarens SI Series off-grid inverters (SI1000 to SI15000) support battery-only operation with solar charging.
In South Africa, grid-tied inverters must comply with NRS 097-2-1 to be legally connected to the Eskom grid. The Solarens SI Series hybrid inverters are NRS 097 compliant, enabling legal grid-tied operation with anti-islanding protection. Non-compliant inverters risk voiding your home insurance and creating safety hazards for Eskom technicians.
The Solarens SI Series + M16S battery system is NRS 097 compliant and available through our South African distribution network.